This method involves driving precast piles into the ground using a pile hammer. The primary construction equipment is the pile hammer (diesel hammer) mounted on the hanging frame of the base machine. Pile sections are lifted, attached to the pile hammer, and then lowered into the ground using the impact energy generated by the collision between the pile hammer and the pile head.