Explanation of construction methods for pressing larsen piles

Explanation of construction methods for pressing larsen piles

Date 30-12-2023 Views 274

Effective methods for constructing larsen piles in construction projects are provided by Hung Giang Engineering and Construction through the information filtered and summarized below. Or you can contact us immediately via Hotline: 0865476666 - 0865426666 to have all your questions answered as quickly as possible!

Characteristics of Larsen pile pressing method
1. Methods of constructing a static press
When applying this measure, the following characteristics will be present:

- The time to construct larsen piles with this method is from 6:00 a.m. to 11:00 p.m.

- Specifications:

+) The impact force does not need to be strong, just a small force will not create noise pollution or impact the surrounding environment.

+) Construction machinery is compact and lightweight, is a single machine so it is convenient to move, does not take time and does not require complicated disassembly.

+) The construction method will be especially suitable for projects with limited construction area such as projects in narrow alleys, projects in inner cities, and densely populated areas. ..

The construction method of pile pressing machine has a good effect, limiting many problems in pile pressing construction

2. Construction method using vibrating hammer
- Construction time is about 7:00 a.m. - 7:00 p.m

- Specifications

+) Principle of creating a vibration force that transmits the force to the pile head using shock force, taking advantage of the kinetic energy created by the transmitted vibration to impact the pile head.

+) The vibrating hammer continuously acts on the pile, transmitting vibrations with a frequency of a certain amplitude and direction, then the interface between the soil and the pile will be significantly reduced.

+) Construction time and progress are fast and relatively accurate.

+) The level of noise pollution is not high.

This construction method is also quite suitable for projects with limited space, quick construction, and quite economical.

Minimum distance for pressing larsen piles
Assemble Larsen piles, drilling rigs, and Larsen piling machines to the construction site. Locate the Larsen pile, at least 800mm from the outside edge of the tank wall. Drilling diameter D400 (only drills to destroy the ground, does not remove sand from the hole), depth 8-9 m. The distance from the center of the borehole is 800m (build 1 heart, remove 1 heart).

Hopefully, with the above sharing from Hung Giang Engineering and Construction, customers will have more useful information about larsen pile construction methods. If you need advice or need to construct larsen piles, you can call us at hotline: 0865476666 - 0865426666 or come to the address: No. 374 Hung Vuong Street, So Dau Ward, Hong Bang District, Hai Phong