Norms and standards for pressing larsen piles
Estimated norms for driving larsen piles (steel sheet piles) on the ground, code AC. 22100 in Project construction estimate norms - Ministry of Construction issued together with document No. 1776/BXD-VP dated August 16, 2007 of the Ministry of Construction calculated for the remaining 100m of piles in the project. For the pile section that is not flooded, the cost of labor, machinery and workers is 0.75 compared to the current pile driving norm.
Note when constructing larsen piles
If you use a Larsen pile press using a vibrating hammer, you need to make sure the hammer head is on the top of the pile. Only operate when the hammer head is stable on the pile and its hanging cables.
You should not increase the vibration frequency of the hammer but need to gradually increase it until the pile is firmly driven before increasing the vibration frequency.
After driving a pile, pay attention to carefully checking the ground to avoid subsidence causing buckling and misalignment of the pressed pile
Do not use machine equipment as it is directly under high voltage wires
When constructing, it is necessary to wear adequate protective clothing according to the law.
Prepare necessary warnings around the construction site when pressing
Absolutely no one is allowed to enter the area where pile pressing is being carried out.